

Course # 0908421
LECTURE: Monday
and Wednesday 10:00-10:50 AM Rowan Hall Room 309 and 304
LABORATORY: Friday 11:00 AM - 1:45 PM Room 301
Dr. Kauser
Jahan, P.E.
Department of Civil and
Environmental Engineering
College of Engineering
Rowan
University
201 Mullica Hill Road
Glassboro, NJ 08028-1701
Email address: jahan@rowan.edu
Telephone:
(856) 256-5323
Fax: (856) 256-5242
Wednesday: 11AM-12PM Monday 11AM-12PM
Upon completion of
the course, environmental engineering students will have a thorough
understanding of wastewater quality and wastewater treatment principles and be
able to design unit operations for a wastewater treatment plant.
Garden City Wastewater Treatment Plant Design Project
Textbook: "Wastewater Engineering" by
Metcalf and Eddy, McGraw Hill.
Homework and Quizzes:
15%
Midterm Exams: 25%
Final Exam: 30%
Team Design Report: 15%
Laboratory: 15%
Exam, Quiz and Homework Instructions
Unannounced quizzes will be given through out the semester. No make-up exams or quizzes will be given for unexcused absences (See Attendance Policy Section). All quizzes and exams are closed book and notes. The final exam will have a duration of 2 hours and will be announced near the end of the semester.
Homework assignments will be given every week. Late homework will not be accepted. Please use the Rowan Engineering Homework Format. To receive full credit for a problem, both your method of calculation and the correct answer must appear in a legible and readily understandable form. No hand-drawn graphs will be accepted.
All assignments are due at the beginning of the class period.
Attendance is required. If you know that you will be absent from a class for a valid reason, obtain approval from instructor 24 hours before the class period. The only exception to this rule is a medical emergency.
|
Mondays |
Topic |
Wednesdays |
Topic |
|
|
|
Sept 4 |
Introduction |
|
Sept 9 |
Wastewater
Quality |
Sept 11 |
Wastewater
Flowrates |
|
Sept 16 |
Wastewater
Treatment Objectives and Implementation |
Sept 18 |
Wastewater
Treatment Plant Design |
|
Sept 23 |
Physical Unit
Operations Flow
Equalization |
Sept 26 |
Sedimentation |
|
Sept 30 |
Sedimentation |
Oct 2 |
Volatilization
and Gas Stripping |
|
Oct 7 |
Gas Transfer |
Oct 9 |
Disinfection/Dechlorination |
|
Oct 14 |
Biological
Treatment Methods |
Oct 16 |
MIDTERM
EXAM #1
|
|
Oct 21 |
Bacterial Growth
Kinetics |
Oct 23 |
Bacterial
Growth Kinetics
|
|
Oct 28 |
Activated Sludge
Process |
Oct 30 |
Activated Sludge
Process Design |
|
Nov 4 |
Trickling
Filters |
Nov 6 |
Rotating
Biological Contactors |
|
Nov 11 |
HOLIDAY
(Veteran’s Day) |
Nov 13 |
MIDTERM
EXAM #2
|
|
Nov 18 |
Biological
Nitrification |
Nov 20 |
Biological
Denitrification
|
|
Nov 25 |
Phosphorus
Removal |
Nov 27 |
Sludge Treatment |
|
Dec 2 |
Sludge Treatment |
Dec 4 |
Effluent
Disposal and Wastewater Reclamation |
|
Dec 9 |
REVIEW |
Dec 9 |
Project Review |
USEFUL
LINKS: WATER AND WASTEWATER

WATER ENVIRONMENT
FEDERATION